The loco is positioned on the scratchbuilt ashpit.Ī pair of Drop Bottom Gondolas deliver coal to the coaling tower in Durango. 461, a Blackstone Models K-27, is coaling up at the Durango Coal Tower. A New York Railway Supply turntable controller, relocated from my previous layout, will be used to power and index the turntable. 461 is turned on the turntable in Durango. The connection to the Rio Grande Southern is the track on the far left, with RGS No. 40 has arrived at the Durango Depot in time to meet Goose 7. The train is traveling Eastbound from Ridgway. 40 at the end-of-track, which will eventually connect Durango to Ridgway. 40, has successfully runįrom the connection to Ridgway through the reverse loop in Durango and back! The following photos show this train, and a K-27 and Galloping Goose, at a few locations within Durango. Trackwork in Durango is now complete, and theįirst train, powered by Rio Grande Southern C-19 No.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |